Residential

Boleyn Court

Modernisation well under way at this private estate in Buckhurst Hill Essex, Works comprising of new control system, new hydraulic power unit, full re-wire and H&S items. Again, all being delivered on a short program to keep disruption to a minimum

READ MORE

31 Three Colt Street, London

This modernisation was carried out on behalf of Compton Property Management, the 4 floor building is served by one electric traction 630kg passenger lift that stopped working suddenly, initial findings were that the obsolete control system had failed completely, the control system was replaced by a UK manufactured microprocessor system and the complete installation was […]

READ MORE

Brompton Square

This job consisted of a major modernisation of an electric traction passenger lift in a fully occupied apartment block. The existing lift was rated at 300kg or 4 persons serving 6 floors open front only at a contract speed of 0.50 m/s, the lift was fitted with picket gates on the car and manual shutter […]

READ MORE

Moreland House, Romford

This job consisted of the removal of a duplex pair of lifts serving 5 floors with the lift shaft to be extended upward a further 2 floors by the builder and installation of a new duplex pair of electric traction MRL package lifts in a fully occupied apartment block, at the time of installation this […]

READ MORE