Tags Archives: Modernisation

Boleyn Court

Modernisation well under way at this private estate in Buckhurst Hill Essex, Works comprising of new control system, new hydraulic power unit, full re-wire and H&S items. Again, all being delivered on a short program to keep disruption to a minimum

READ MORE

Vm Elevators completes Modernisation under NDA in Central London

VM Elevators recently completed the full modernisation under NDA in Central London. This modernisation was inclusive of new Sassi machines, Kollmorgen control systems and with back up power supplies. It also includes a Safeline emergency communication system along with full landing and car make overs. The job was completed on time and to agreed schedule.

READ MORE

NHS Centre – Holloway

Full control system upgrade is well under way at this NHS centre in Holloway Rd North London. VME have worked on the estate in recent years and are happy to be once again providing our services for the trust

READ MORE

Queens Court, Romford

This project is being undertaken on behalf of RMS Property Ltd This building is served by a duplex pair of 600kg hydraulic lift serving 5 floors manufactured by Otis that has now passed its working life expectancy and has many obsolete parts. The scheme we have offered is to retain the hydraulic cylinders and replace […]

READ MORE

31 Three Colt Street, London

This modernisation was carried out on behalf of Compton Property Management, the 4 floor building is served by one electric traction 630kg passenger lift that stopped working suddenly, initial findings were that the obsolete control system had failed completely, the control system was replaced by a UK manufactured microprocessor system and the complete installation was […]

READ MORE

Brompton Square

This job consisted of a major modernisation of an electric traction passenger lift in a fully occupied apartment block. The existing lift was rated at 300kg or 4 persons serving 6 floors open front only at a contract speed of 0.50 m/s, the lift was fitted with picket gates on the car and manual shutter […]

READ MORE

London Energy

This job consisted of the major modernisation of 3 x 1000kg or 13 persons goods/passenger lifts in a fully functional waste processing plant, the plant was undergoing other renovation works and so maintaining time schedules and completing tasks on time was paramount as site security and Health and Safety protocol was a major factor in […]

READ MORE

Smithfields

VM Elevators Ltd. Have been servicing lifts for various companies within the Smithfield meat Market since 2015 and have recently secured the lift modernisations for 3 companies within this complex. All 3 modernisations were very similar consisting of the following: New control panel New gear unit New gear raft New hoist ropes New guarding Replace […]

READ MORE

Safestore Newcastle

VM Elevators were contracted by Safestore to carry out the modernisation of 2 Goods/Passenger lifts, one at 1500kg the other at 2000kg at their storage facility in Newcastle. Both lifts serve 4 floors & are open through. The works consisted of replacing the control system with a UK supplied VVVF panel, replacing the manual car […]

READ MORE

Whittington Hospital

VM Elevators were contracted to carry out the refurbishment of a triplex group of Bed/Passenger lifts at the Whittington Hospital in north London, the control system was replaced with top of the range Kollmorgen MPK114 microprocessor system. In addition the rear bed lifts had full in-car make overs consiting of LED lighting upgrades and stainless […]

READ MORE