Big Sky
June 6, 2021VME undertook the major overhaul works of Big Sky Studios which is the largest photographic studio in London. The site is nonstop throughout the year accommodating all the big houses in the industry and time was of the essence within this program with only a short window between Christmas and the New Year. Works entailed […]
READ MOREMoreland House, Romford
June 5, 2021This job consisted of the removal of a duplex pair of lifts serving 5 floors with the lift shaft to be extended upward a further 2 floors by the builder and installation of a new duplex pair of electric traction MRL package lifts in a fully occupied apartment block, at the time of installation this […]
READ MOREStoke Road, Slough
June 4, 2021This job consisted of the installation of 3 off new 630kg or 8 persons electric traction MRL package lifts for a new build apartment block with a contract speed of 1.00 m/s, 2 of the lifts served 5 floors and the third 6 floors, all open front only. This installation required coordination with the Main […]
READ MOREElders Care Home, Epsom
June 4, 2021This job consisted of the removal of an existing chain driven enclosed access platform lift with a new hydraulic enclosed access platform lift, at the time of installation this was a fully occupied care home for the elderly requiring extra vigilance by our installation engineers. The existing platform lift was rated at 272kg or 3 […]
READ MOREChelsea Square
June 4, 2021This job consisted of the installation of a new electric traction MRL package lift for use in a private dwelling environment, at the time of installation this site was undergoing complete renovation. This lift was installed in a newly built shaft to accommodate a lift rated at 375kg (5 persons) travelling at 1.00 m/s serving […]
READ MORE34A Henrietta Street
June 4, 2021This job consisted of the removal of the existing redundant lift and installation of a new electric traction MRL package lift for use in a hotel environment, at the time of installation this site was undergoing complete renovation. This was a particularly challenging project as the shaft was very tight just 1150mm wide x 1180mm […]
READ MORESafestore Mitcham
May 25, 2021VM Elevators were contracted by Safestore to supply, install, test & commission I x Hydraulic 2000kg Goods/Passenger lift serving 3 levels, the asset was installed in a newly built hoistway. This installation was completed, tested & handed over in 17 working days.