Tags Archives: Design & Install
Stoke Road – Slough
June 4, 2021This job consisted of the installation of 3 off new 630kg or 8 persons electric traction MRL package lifts for a new build apartment block with a contract speed of 1.00 m/s, 2 of the lifts served 5 floors and the third 6 floors, all open front only. This installation required coordination with the Main […]
READ MOREElders Care Home, Epsom
June 4, 2021This job consisted of the removal of an existing chain driven enclosed access platform lift with a new hydraulic enclosed access platform lift, at the time of installation this was a fully occupied care home for the elderly requiring extra vigilance by our installation engineers. The existing platform lift was rated at 272kg or 3 […]
READ MOREChelsea Square – London
June 4, 2021This job consisted of the installation of a new electric traction MRL package lift for use in a private dwelling environment, at the time of installation this site was undergoing complete renovation. This lift was installed in a newly built shaft to accommodate a lift rated at 375kg (5 persons) travelling at 1.00 m/s serving […]
READ MORE34A Henrietta Street – London
June 4, 2021This job consisted of the removal of the existing redundant lift and installation of a new electric traction MRL package lift for use in a hotel environment, at the time of installation this site was undergoing complete renovation. This was a particularly challenging project as the shaft was very tight just 1150mm wide x 1180mm […]
READ MORESafestore – Mitcham
May 25, 2021VM Elevators were contracted by Safestore to supply, install, test & commission I x Hydraulic 2000kg Goods/Passenger lift serving 3 levels, the asset was installed in a newly built hoistway. This installation was completed, tested & handed over in 17 working days.
READ MORE