Tags Archives: Design & Install
Pembroke House – London
December 1, 2023We’re excited to share the completion of a significant project at Pembroke House, Kensington Village, in central London, a collaboration with Scott Osborn Ltd and Watkins Payne. VM Elevators successfully replaced a trio of distinguished passenger lifts, each with a 1000kg capacity, accommodating up to 13 people and serving seven floors.
READ MOREWood Green Diagnostic Centre – London
November 20, 2023We are thrilled to share our latest new lift installation at the Whittington Health NHS Trust Wood Green Diagnostic Centre (CDC), a leading healthcare facility serving as a vital resource for the local community, bringing diagnostic testing to the heart of Haringey.
READ MOREOdeon – Birmingham
February 6, 2023An upcoming lift installation by VM Elevators at Odeon, Birmingham is set to bring a new level of convenience and accessibility to the building. The installation will begin in February 2023 and involve a number of key components and processes to ensure a smooth and efficient operation of the lift. The first step in […]
READ MOREFranklin House – Winchester
October 26, 2022We are excited to share our latest installation project at Franklin House, Winchester. The job consisted of: Removal of closed protocol outdated systems Fully prepared lift shaft Painting and sealing of area And the installation a 630kg, 8person Traction MRL Lift Package ‘One Lift’ at the modernised and prestigious office premises. Benefits to the customer [...]
READ MORESafestore – Holland
September 14, 2022Job: (modernisation, installation, May 2022 repair, service) Date of works commencing: May 2022 In June 2022, we successfully completed on modernisation works at Safestore, Holland. Safestore is the UK’s largest and Europe’s second largest provider of self-storage. It is listed on the London Stock Exchange and is a constituent of the FTSE 250 Index. The […]
READ MOREIbis Styles Hotel – Walthamstow
July 21, 2022VM Elevators Ltd. are proud to announce the successful completion of our latest lift installation project at the prominent Ibis Styles hotel, London Walthamstow. The job consisted of the removal and replacement of 4 stop hydraulic lift to 1 meter per second 630kg traction ‘One Lift’ product. The project was completed in an outstanding […]
READ MOREWhite City – London
June 22, 2021This project was to supply, install, test and commission 1 No. goods only lift rated at 1500kg serving 2 floors open front only complete with self-supporting steel structure in a newly renovated warehouse. This installation was carried out whilst the building was in the process of being internally renovated on both levels requiring stringent planning […]
READ MOREPhillimore Gardens – London
June 22, 2021The equipment for this project was purchased by the client directly from the lift manufacturers. VM Elevators were recommended to the client as a preferred installer as we have previous experience installing and testing this equipment on our own new build projects. The location of the project was a fully occupied private dwelling in central […]
READ MOREBig Sky – London
June 6, 2021VM Elevators undertook the major overhaul works of Big Sky Studios which is the largest photographic studio in London. The site is nonstop throughout the year accommodating all the big houses in the industry and time was of the essence within this program with only a short window between Christmas and the New Year. Works […]
READ MOREMoreland House – Romford
June 5, 2021This job consisted of the removal of a duplex pair of lifts serving 5 floors with the lift shaft to be extended upward a further 2 floors by the builder and installation of a new duplex pair of electric traction MRL package lifts in a fully occupied apartment block, at the time of installation this […]
READ MORE