Hospitality
Ibis Styles Hotel – Walthamstow
July 31, 2022VM Elevators Ltd. is proud to announce the successful completion of our latest lift installation project at the prominent Ibis Styles hotel, London Walthamstow. The job consisted of the removal and replacement of 4 stop hydraulic lift to 1 meter per second 630kg traction ‘One Lift’ product. The project was completed in an outstanding 10 […]
READ MOREIbis Styles Hotel – Walthamstow
July 21, 2022VM Elevators Ltd. are proud to announce the successful completion of our latest lift installation project at the prominent Ibis Styles hotel, London Walthamstow. The job consisted of the removal and replacement of 4 stop hydraulic lift to 1 meter per second 630kg traction ‘One Lift’ product. The project was completed in an outstanding 10 […]
READ MOREQueens Hotel
June 5, 2021VM Elevators Ltd. Were contracted by DPS Lift Consultancy to assess and modernise a 630kg 8 person passenger MRL lift serving 8 floors in the above premises, the lift had been idle for 1 year. Upon investigation it was found that the now defunked Carlos Silva MRL control system was non-functional and the gearless winding […]
READ MORE34A Henrietta Street
June 4, 2021This job consisted of the removal of the existing redundant lift and installation of a new electric traction MRL package lift for use in a hotel environment, at the time of installation this site was undergoing complete renovation. This was a particularly challenging project as the shaft was very tight just 1150mm wide x 1180mm […]
READ MORE